Planning Appeals in Dacorum
Hemel Hempstead, Berkhamsted, Tring and the Chilterns edge

Dacorum Borough Council's refusals tend to fall into a small number of groups: harm to the Green Belt, design that does not fit the street, and, since 2022, the effect of new homes on the Chilterns Beechwoods. Cedar Planning, led by Dan Malloy MRTPI, tests each reason against the policy wording and the evidence before advising whether to appeal.

We take on appeals across Hertfordshire, from Hemel Hempstead's New Town neighbourhoods to the villages around Tring, and quote each one as a fixed fee.

  • RTPI Chartered
  • Fixed-fee quotations
  • Direct advice from a Chartered Planner

The policy picture behind Dacorum decisions

Dacorum's development plan is older than most. The Core Strategy was adopted in September 2013 and the Site Allocations document in July 2017, and a number of policies and appendices are still saved from the Local Plan adopted in 2004. Policy CS5 on the Green Belt and Policies CS11 and CS12 on design appear in a large share of refusal notices.

A replacement is on its way. The Dacorum Local Plan to 2041 was submitted for examination on 11 March 2025, and the third stage of hearings took place in March 2026. At the time of writing the Inspectors' main modifications were awaited. Until the plan is adopted its policies carry limited but increasing weight, and the 2013 policies have to be read against current national policy.

Housing supply is a long-running weakness. The council has not been able to show a five-year supply of deliverable housing land, so for schemes that add homes the presumption in favour of sustainable development is engaged, unless Green Belt, habitats or heritage policies give a clear reason to refuse.

New home within reach of Ashridge?

Much of the borough lies within the 12.6km zone of influence around the Chilterns Beechwoods Special Area of Conservation. Net new homes there need a mitigation payment and access to suitable alternative natural greenspace. A refusal on this ground can often be resolved, so we check the position before recommending an appeal or a fresh application.

Typical refusal reasons in Dacorum

Green Belt harm

Policy CS5 applies national Green Belt policy to most land outside the towns. Extensions judged disproportionate, replacement dwellings that are materially larger and new buildings on open land are the usual targets, along with saved Policy 22 for house extensions.

Design and neighbour impact

CS11 and CS12 deal with neighbourhood and site design. Refusals cite bulk, loss of spacing between houses, overlooking and parking, often with reference to saved Appendices 3 and 7 on residential layout and small-scale extensions.

Chilterns Beechwoods

Where a scheme adds a dwelling and no mitigation is secured, the council refuses on the ground that harm to the Special Area of Conservation cannot be ruled out.

Heritage and the Chilterns

CS27 protects listed buildings and conservation areas, including Berkhamsted and Tring town centres. CS24 protects the Chilterns National Landscape around Tring, Aldbury and Little Gaddesden.

How a planning appeal against Dacorum Borough Council works

An appeal puts your scheme in front of an independent Inspector. We run it in four stages.

Reading the refusal

We read the decision notice with the officer report, consultee comments and plans. In Dacorum the report often shows whether the objection is to the principle, to a detail of the design, or only to missing Beechwoods mitigation.

Choosing the route

Householder refusals follow the fast householder procedure. Most other cases go by written representations. A hearing can suit a Green Belt case where openness or very special circumstances need to be discussed. The Inspectorate decides the procedure.

Building the case

Our statement takes each reason in turn, applies the Core Strategy and saved policies, and explains the weight they should carry against national policy. Evidence may include a Green Belt assessment, a heritage statement or a habitats mitigation agreement.

Visit and decision

The Inspector visits the site and issues a written decision. We do not promise a date, because timescales depend on the Inspectorate's workload, and we explain the outcome and your next options whichever way it goes.

Making the case against Dacorum's policies

Because the Core Strategy predates the current National Planning Policy Framework, the first question at appeal is how far each policy is consistent with national policy. Where the wording is stricter than the Framework, an Inspector may give the conflict less weight.

Green Belt cases now also turn on whether land counts as grey belt. A site that makes a limited contribution to the Green Belt purposes may no longer be inappropriate development, which changes the argument on the edge of Hemel Hempstead, Bovingdon and Kings Langley.

For householder schemes the question is usually one of degree. We compare the proposal with the original building, with what permitted development would allow, and with similar extensions the council has approved nearby.

Key policy areas we navigate

Extensions in the Green Belt

Size increases are measured against the original dwelling. See our guide to extending a house in the Green Belt.

Habitats mitigation

We confirm whether a site is inside the zone of influence and what mitigation is available before any appeal is lodged.

Rural buildings

Refused barn conversions may be appealed as full applications or as Class Q prior approvals, which follow different tests.

The emerging plan

Sites affected by the Local Plan to 2041 can be supported through Local Plan representations as well as an appeal.

Why Cedar Planning

A Consultancy That Works With You, For You

A Dacorum refusal is rarely beyond argument, but it is not always worth appealing. Where the only obstacle is habitats mitigation or one design point, a revised application is usually quicker.

Where the objection is to the principle, such as a Green Belt or location reason, an appeal may be the only route. We tell you which case you have before you spend money on it.

RTPI Chartered

Led by a Chartered member of the Royal Town Planning Institute with more than ten years of public and private-sector planning experience.

Honest Prospects

A realistic view of the planning risks and options before you commit time or money.

Fixed, Transparent Fees

Fixed-fee quotations agreed before work starts, so you know the cost from the outset.

Direct Access

You deal with the Chartered Planner doing the work, not an account manager.

Dacorum Planning Appeals

Dacorum Planning Appeal FAQs

Beechwoods My application was refused because of the Chilterns Beechwoods. Can I appeal?

Yes, but an appeal will only succeed if mitigation is secured, because the Inspector must also be satisfied that the protected site will not be harmed. It is often quicker to secure the mitigation and resubmit. We advise which route suits your site.

Green Belt Can I appeal a refused extension to a house in the Green Belt?

Yes. Householder appeals must be made within 12 weeks. The case usually turns on whether the extension is disproportionate to the original building and on any fallback under permitted development. See our page on householder planning appeals.

Supply Does Dacorum's housing land supply help my appeal?

For schemes that add homes it can, because the presumption in favour of sustainable development applies. It does not override Green Belt, habitats or heritage policies where they give a clear reason to refuse.

Emerging plan Does the new Local Plan to 2041 count at appeal?

It is a material consideration. Its weight depends on how far the examination has progressed and whether the relevant policy is still disputed. We check the latest examination documents for your site.

Options Should I appeal or submit a revised application?

If the officer report shows one fixable objection, revise and resubmit. If the council objects to the principle, an appeal is usually needed. Our guide on what to do after a refusal compares the two.

Request a Free Appeal Review

Send us the Dacorum decision notice, the refused plans and the site address. We will tell you honestly whether an appeal has a realistic prospect of success and give you a fixed-fee quote.

Or email us at info@cedarplanning.co.uk with the relevant information.

Send us a Dacorum decision notice for review, or book a free 15-minute call. Our appeal process guide explains each stage.